To relax the time constraint of the FTSA(feedback-based two-stage switch architecture)
a new scheme called FFTS(front-feedback-based two-stage switch architecture) was proposed
which enabled the cell transmission to take place in parallel with the scheduling process with the adoption of putting the feedback operation before the cell transmission and thus extended the time space of the scheduling algorithm effectively.In addition
the FFTS used the double-cell-buffer mode and re-sequencing buffer to solve the consequent problem such as cell conflict and disordering.Simulation and analysis show that FFTS has a better delay performance compared with the other non-feedback two-stage switch architecture.
Multi-indicator intention-driven adaptive optimization strategy for UAV computation offloading and trajectory planning
Traffic prediction and load balancing based on in-band network telemetry data
Coordinated UAV-UGV trajectory planning based on load balancing in IoT data collection
MgdFlow: multi-granularity data flow management algorithm in microgrid scenario
Neighbor satellite load based low orbit satellite distributed routing algorithm
Related Author
Zhang Zhizhong
Guo Lei
Liu Yan
Ning Zhaolong
Huang Xinliang
Lin Peng
GUO Lei
LIU Wei
Related Institution
School of Computer Science and Engineering, Northeastern University
School of Communication and Information Engineering, Chongqing University of Posts and Telecommunications
School of Electronic and Information Engineering, Nanjing University of Information Science and Technology
Key Laboratory of Intelligent Support Technology for Complex Environments, Ministry of Education, Nanjing University of Information Science and Technology
Key Laboratory of Big Data Intelligent Computing, Chongqing University of Posts and Telecommunications